MEP Estimating: The Most Specialized Area of Construction Cost Analysis
Mechanical, Electrical, and Plumbing (MEP) trades represent 25–40% of total construction cost on most commercial projects. Specialty subcontractors who invest in professional MEP estimating gain a significant competitive advantage in the bidding process.
Electrical Estimating
Key scope items covered in every electrical estimate:
Labor rates: IBEW journeyman rates range from $28/hour in rural markets to $95+ per hour in New York City and San Francisco, plus 35–50% fringe benefits. We apply the correct prevailing wage rate for every project location.
Plumbing Estimating
Key scope items:
UA labor rates are applied by state and market. We account for rough-in, trim, and testing labor separately.
HVAC Estimating
Key scope items:
SMWIA sheet metal rates and pipefitter rates are applied by regional market.
Why MEP Subcontractors Outsource Estimating
FAQ
Q: Can you estimate MEP from architectural drawings only?
A: Yes. We provide preliminary MEP estimates from architectural drawings and update them when engineering drawings are issued.
Q: Do you estimate union and non-union projects?
A: Yes. We maintain IBEW, UA, and SMWIA prevailing wage databases as well as open-shop labor rate data for all major US markets.
Internal Links: [Construction Estimation Services](/services/construction-estimation) | [Get a MEP Estimate Quote](/contact)
