<Website />deploy()AI.automate()SEO.rank(1)const appawait db.save(){ fast: true }npm run builduseState()git pushapi.post()<Hero />flex gridreturn <>export default200 OKcdn: trueasync =>ShopifyWhatsApp.bot()
HaseebSoft
Back to Blog
Construction Estimation9 min readBy HaseebSoft Estimation Team

Sitework & Grading Estimation for US Contractors: Cut, Fill & Earthwork

Sitework is where many bids are won or lost. Underestimating earthwork can erase your entire project margin. Accurate cut-fill analysis and equipment selection are critical.

Sitework EstimationGrading EstimationEarthwork QuantitiesCut Fill CalculationCivil Estimation USA
🚜

Sitework Estimation Fundamentals

Earthwork Cut and Fill

Basic principle: Cut volumes (excavation) and fill volumes (compaction) must balance on-site, or export/import costs apply.

Swell factor: Excavated soil expands 10-30% (depends on soil type). Account for this when calculating truck loads.

Compaction factor: Fill material must be compacted to specification, reducing volume 5-15%.

Equipment Costs

  • Track excavator (200,000 lb class): $150-250/hour
  • Dozer (D6-D8): $120-200/hour
  • Scraper: $200-350/hour
  • Dump truck: $75-120/hour (including driver)
  • Utility Trenching

  • Trench excavation (machine): $8-18/LF
  • Bedding and backfill: $3-8/LF
  • Trench restoration (pavement): $15-35/LF
  • Common Sitework Line Items

  • Clearing and grubbing: $2,000-6,000/acre
  • Rough grading: $1.50-4.00/CY
  • Fine grading: $0.50-1.50/CY
  • Erosion control (silt fence): $2.50-4.00/LF
  • Aggregate base: $15-30/ton (installed)