Sitework Estimation Fundamentals
Earthwork Cut and Fill
Basic principle: Cut volumes (excavation) and fill volumes (compaction) must balance on-site, or export/import costs apply.
Swell factor: Excavated soil expands 10-30% (depends on soil type). Account for this when calculating truck loads.
Compaction factor: Fill material must be compacted to specification, reducing volume 5-15%.
Equipment Costs
Utility Trenching
Common Sitework Line Items
Internal Links: [Construction Estimation Services](/services/construction-estimation) | [Upload Drawings for Estimate](/contact)
Share this article